Central United Methodist Church of Skokie

Complete exterior and partial interior renovation of a 4,000 s.f. log cabin originally constructed in 1927. A new roof was installed over the entire structure. The roof over the great room was completely removed and reconstructed. New windows were installed throughout. A new dormer was constructed on the east side of the second floor. All logs were reviewed and analyzed for damage and documented for replacement. The entire exterior of the cabin was re-chinked, stained and re-sealed. A one room addition on the south side was removed for a future new room which will enclose a garden courtyard.

Location: Skokie, IL
Design: 2009-2010
Construction: Nov 2010
Design Principal: Ann Clark
Project Architect: Lane Fowlie
General Contractor: Country Craftsman J.R. Graves
Log Expert / Supplier: Rick Bott
Structural Engineer: The Structural Shop
CMCU_1b
CMCU 3
CMCU 4
CMCU_2b
CMCU 5